Unscreened fill dirt is the workhorse that builds grade, fills voids, and stands behind walls. Nobody sees it; everything sits on it. The cheapest yardage the yard sells.
The jobs this material shows up on every week — straight from the crew that loads it.
Builds up low yards, building pads and road shoulders by the truckload.
Fills foundations, pools and trenches — compacted in lifts as you go.
The mass that stands behind retaining walls while the pretty stone faces out.
Old cisterns, tree holes, abandoned utilities — dirt is the answer.
Pick your depth, read what one yard covers, and order by the math — the same math the loader runs.
| Depth | 1 Yard Covers | Best For |
|---|---|---|
| 6 in | 54 ft2 | Yard & lawn build-up |
| 12 in | 27 ft2 | Standard backfill lifts |
| 18 in | 18 ft2 | Behind retaining walls |
| 24 in | 13 ft2 | Deep void fill |
Coverage = 27 ft3 at depth. Compacted fill loses height — order 10–15% extra when building grade.
Photos from the piles and the finished work — what this material looks like when it lands.
Same-day loads, same truck, same crew — four more materials the yard runs.
Know your yards? Call the yard and we’ll load it today. Not sure yet? We’ll do the math with you and quote the whole drop in one call.